5m process

5M – Solution space focuses on the data migrations. It is tightly integrated with 5D solution process.

5M – Data migrations generate business process models based on industry standard templates.

5M – Define the requirements based on the discovery session and BPMN models.

5M – Design the solution and generate the technical designs including Infrastructure, Physical data, Object models.

5M – Tie the process definition to execution by generating the project templates with detailed work breakdown structure.

5M – Provide Manage capabilities to drive the solution with a robust ticketing and monitoring solution.

5M – Import existing models and map to templates.

5M – Solutions are completely deployable in cloud utilizing the cloud storage and databases to provide a scalable architecture.

5M – Precess

5M – An efficient and effective data migration process, deeply interlaced with the 5D approach for delivering the value to the client. Improves the data quality.

5M – Meta, Model, Move, Manage, Monitor

5M – Meta

5M – Meta – Identifying the source and targets for the data migration, identifying the details that are needed to connect and work with the source and targets. All the required details like, application or Database, connection url, login details are collected and stored in the template. Discover with complete profile and audit of all source systems in scope. Profile and audit helps in identifying the problem spots. Assess the impact of data quality. Scan the environment – identify the interface in act.

5M – Model

5M – Model – Capturing the details in the free model, high-level requirements and then developing the Business Process Model to understand the Business Processes. A Requirement model is generated to map the process definition to requirements and LDM to build the flow and represent any dependencies among the objects. PDM are generated to analyze objects and their relationships. Data Movement Model is constructed to show the data flow from the source to the target and the transformations applied per the business rules.

5M – Move

5M – Move – Understanding what you want to move and from where to where? The move is most critical in identifying the objects that need movement, any dependency objects, business rules that are applied in the source system along with the lookup tables. Mapping the source objects to the target objects and fields. The validations that need to be performed and the what verification methodology is needed. Identify the inter system dependencies.

5M – Manage

5M – Manage – Scheduling the job for data loading. One time migration is done after confirmation and processed for production system. Recurring load process is scheduled through batch operations and schedule configuration. The packs, that extract, transform and load data, are managed. The errors that encountered during executions are managed.

5M – Monitor

5M – Monitor – Monitoring the job for Audit rules and sending the emails to the respective people. Accessing the log files.